Scope of Works

Project Overview


We specialise in high-end rental property refurbishments for Cluttons on behalf of Brownlow Developments. Each year, we refurbish approximately 10-15 properties, focusing on delivering fast, high-quality turnarounds to ensure the properties are ready for rental as quickly as possible. Our in-house team manages every aspect of the refurbishment, ensuring efficiency, budget control, and timely delivery.

Client Requirements


The client required a reliable refurbishment partner to manage a steady flow of high-end rental properties. The focus was on delivering top-tier finishes, including structural works, asbestos removal, mechanical and electrical (M&E) installations, kitchen and bathroom designs, joinery, flooring, and final decorative touches. The properties needed to be ready for rental swiftly without compromising on quality.

Scope of Work

  • Strip Out/Demolition: Initial clearance and preparation of the properties.
  • Asbestos Removal: Safe and certified removal of hazardous materials.
  • M&E Installation & Design: Full design and installation of mechanical and electrical systems to meet modern living standards.
  • Kitchen/Bathroom Installations: Bespoke design and installation of kitchens and bathrooms.
  • Joinery: Custom carpentry solutions for wardrobes, blinds, and other essential fittings.
  • Decorations & Flooring: High-end decorative finishes and flooring installation to create luxurious living spaces.
  • Final Finishes: Ensuring every detail, from fixtures to final touch-ups, met the client's high standards

Results and Outcome


The refurbishment of each property was completed within budget and on time, allowing the client to swiftly re-let the properties to tenants. The efficient project delivery maximized rental income potential while maintaining the high standards expected by both Cluttons and Brownlow Developments.

 

It's About Accreditations

Get in touch.

Let's Connect.