Scope of Works

Project Overview: 

WSW Refurbishments completed a comprehensive project in Wapping, London. On behalf of First Port, this project focused on upgrading a residential block's communal areas, including electrical upgrades and fire alarm installations. 

Client Requirements:

Upgrade the communal areas of the residential block, making them more functional and welcoming for residents.  

Scope of Works:

  1. Communal Refurbishment

The primary goal was to refresh and modernise the communal spaces. This included repainting walls, replacing worn-out flooring, and updating communal furnishings.

  1. Electrical Upgrade

A critical aspect of the project was upgrading the electrical systems to meet current safety standards and improve energy efficiency. This involved rewiring, installing new lighting fixtures and ensuring all electrical installations complied with the latest regulations.

  1. Fire Alarm Installation

To enhance safety, a new, state-of-the-art fire alarm system was installed throughout the building. This system included smoke detectors, alarm panels, and emergency lighting to ensure comprehensive fire protection.

  1. Project Execution - Planning and Preparation

Detailed planning was essential for this project to minimise disruption to residents. A thorough assessment of the building’s existing conditions was conducted, followed by the development of a step-by-step refurbishment plan. All necessary permits were obtained, and safety protocols were established.

  1. Implementation

Electrical Upgrade: The electrical upgrade began with a complete inspection of existing systems. The old wiring was replaced, and new, energy-efficient lighting fixtures were installed. Special attention was given to ensuring all electrical work complied with current safety standards.

Fire Alarm Installation: The fire alarm system was installed meticulously, with smoke detectors placed strategically and emergency lighting installed to guide residents during an evacuation. The system was tested thoroughly to ensure reliability and compliance with safety regulations.

Results and Outcome: 

The project was completed on time and within budget, significantly enhancing the communal areas of Gun Place. Residents now enjoy a refreshed, modern environment, and the upgraded electrical systems and fire alarm installations provide improved safety and energy efficiency. The client, First Port, expressed high satisfaction with the quality of work and the professionalism of the WSW Refurbishments team.






 

 